I got 691 email notifications from Renovate and 740 from Dependabot in 2026. Dependabot is great as it automatically PRs dependency updates for you, but it quickly gets too noisy and needs constant rebases. Renovate improves upon Dependabot by letting you group many dependency upgrades into a single PR. At some scale, the amount of attention these notifications require all day long is just too much, and I am not quite ready to roll out auto-merge of Dependabot PRs. I wanted to group the work in ways that I can adjust and control across the hundreds of repos I’m involved with.
My fix is boring. I use the macOS scheduler, launchd, and a LaunchAgent to run a dependency update skill every other Saturday. Claude Code sweeps every project I’m actively working on and opens one PR per project with all the minor and patch updates already tested, stacks PRs on top for the major upgrades it can manage, and lists the rest.
Implementation Details
A LaunchAgent is a plist with a label, a command, a schedule, and where to send output. I keep mine in my dotfiles, next to the instructions and skills I share between Copilot and Claude. This one runs every Saturday at 3:00, through a login shell, so that rvm, nvm, and claude are on the PATH.
<key>Label</key>
<string>com.dblock.update-dependencies</string>
<key>ProgramArguments</key>
<array>
<string>/bin/bash</string>
<string>-l</string>
<string>/Users/dblock/source/dotfiles/scripts/osx/update-dependencies.sh</string>
</array>
<key>StartCalendarInterval</key>
<dict>
<key>Weekday</key>
<integer>6</integer>
<key>Hour</key>
<integer>3</integer>
<key>Minute</key>
<integer>0</integer>
</dict>
The plist runs update-dependencies.sh, which runs the skill with Claude Code in headless mode and saves its report.
caffeinate -i claude -p "/update-dependencies Unattended scheduled run: nobody can answer questions. ..." \
--permission-mode auto --permission-prompts none --output-format json > "$json"
Nothing about this worked on the first try.
launchdcan’t express “every other week”, so the job runs every Saturday and the script exits on odd weeks. My first version used ISO week numbers, which would have gone three weeks without a sweep at New Year, because both week 53 and week 1 are odd. It now counts weeks since the Unix epoch.- A headless
claude -pwaits for background subagents for only 10 idle minutes by default. A sweep starts one agent per project and takes hours, so the script raisesCLAUDE_CODE_PRINT_BG_WAIT_CEILING_MSto 8 hours. - The docs reserve
bypassPermissionsfor isolated containers and VMs. Auto mode with--permission-prompts noneapproves routine actions with a classifier and denies the rest instead of waiting for me to click something at 3:00. - The first dry run died in
cd, because my login shell loadsgvm, which redefinescd, and it crashes underset -u. The script now callsbuiltin cd. - It also left a lock directory behind, which would have blocked every future run. The lock now records a process ID and clears itself when that process is gone.
Linking a plist into ~/Library/LaunchAgents does nothing until it’s loaded with launchctl bootstrap, and a sleeping Mac runs nothing at all. So I wrote schedule.sh for the day my Mac implodes. It installs the tools the jobs need with Homebrew, links and loads every LaunchAgent in my dotfiles, and schedules a wake.
for plist in "$dir"/LaunchAgents/*.plist; do
label="$(/usr/libexec/PlistBuddy -c 'Print :Label' "$plist")"
link="$agents_dir/$(basename "$plist")"
ln -sfn "$plist" "$link"
launchctl bootout "$domain/$label" 2>/dev/null || true
launchctl bootstrap "$domain" "$link"
done
sudo pmset repeat wakeorpoweron MTWRFSU 04:55:00
It turns out that macOS keeps exactly one repeating wake schedule, and pmset repeat replaces whatever was there. Other jobs need a daily wake, so the Mac wakes at 4:55 every day, and launchd runs a 3:00 sweep that the Mac slept through as soon as it wakes up.
When a sweep fails, I want to know. I tried terminal-notifier, which can open the report when you click a notification, but on macOS 26 the Homebrew build is ad-hoc signed and never gets permission to post notifications. A failed sweep now shows a plain osascript alert instead. It stays on screen until I dismiss it, and its Open button opens the report.
Project Management
Deciding what “every project I’m actively working on” means took a few rounds. The skill looks at every repository I can push to, whether it’s mine, an organization’s, or someone else’s where I’m a collaborator, and skips forks and archived ones. A project is active when its default branch has a commit that wasn’t made by a bot in the last 3 months, because bots pushing their own branches would make everything look active. Projects untouched for 3 to 12 months are listed in the report for me to pick from, and older ones are skipped. A projects.yml in my dotfiles includes what discovery misses, such as create-a-github-issue, a fork that I maintain as a project of its own, and excludes organizations and repositories I don’t want swept, such as everything in opensearch-project, which I no longer work on. My dotfiles are public, so private repositories go into an untracked projects.local.yml next to it.
The First Sweep
A dry run with update-dependencies.sh --dry-run discovers projects, locates their checkouts, and changes nothing. It took 3 minutes, and this is the top of its report.
## Discovery
- Sources: 330 writable repositories (not archived, not forks), plus 16 App Platform apps
backed by 16 repositories, plus the one include-list entry, `dblock/create-a-github-issue`.
That entry is a fork, but it's included explicitly.
- Excluded: 9 writable `opensearch-project/*` repositories, matched by the `exclude` list.
- Counts:
- Active: 125.
- Dormant: 11. Normally I'd ask which of these to sweep.
- Inactive: 195.
- Activity rule: a project's age is its newest default-branch commit not made by a bot,
counted from today (2026-11-25). "Active" means a commit since 2026-08-25. "Inactive"
means none since 2025-11-25.
## Active Projects and Checkouts
118 of the 125 have a checkout ...
The first real sweep is on December 5, and could open one PR for each of up to 125 projects, plus stacked major upgrades. If the first run holds up, I’ll add instructions to merge those PRs on green.
I’ll report back after December 5.
